Plugs are pulled on a 2"x2" spacing at a depth of 1.5" |
After drying, the cores are piled and picked up by the crew |
After we pickup the plugs, the greens are blown clean |
A liberal topdressing is applied |
We drag the sand in, filling the holes |
Calcium, magnesium, and potassium are applied |
No comments:
Post a Comment